included in its consent calendar.
|
included in its consent calendar.
Photo by Leslie Murphy
San Vicente Reservoir in East Region,nike air max damen, July 16,nike free 3.0, 2014.
The particular San Diego City Council Wednesday unanimously approved an agreement with all the County Water Authority to analyze the viability of a hydroelectric energy storage system on the city-owned San Vicente Tank near Lakeside,Nike Free.
The two-year, $900,nike air max 1, 000 study will certainly build on an assessment performed last year that found this kind of system could produce $1-2 billion of revenue for your city over its life time.
In March,nike air force 1, city authorities estimated a cost of $1 billion to construct the storage space plant,Christian Louboutin pumps, partly because a 2nd,Moncler Kinder, smaller reservoir would have to become built.
An in-depth evaluation is needed to select the optimal dimension of the project,nike free schweiz, the most appealing business model,air max schweiz, and the optimal tactical positioning for the partnering organizations,Air Max Thea, city officials said.
Based on city staff,air max 90, the goal of the actual call the "pumped drinking water storage project" would be to counter increasing costs of energy plus imported water,Nike Air Force 1, and help the town meet its climate plan of action goals.
A city survey says the plan is to generate what is essentially a large battery power that would be capable of delivering five hundred megawatts of power,primark online shop, intended for eight hours a day,nike air, towards the grid during periods an excellent source of demand.
The council accepted the item without comment,nike free Österreich, included in its consent calendar.
Special Feature Drought
The Women
Rarely Edible |
|
|
|
|
|